Cardboard factory AD “UMKA” has the equipment for purification of process water, which has been significantly improved with the realization of investments from 1997/98. in part of the reconstruction of mass preparation facility.
The next phase of investment has anticipated investments in the complete closure of the flow of process water and investments in the modernization of the facility for waste water treatment.
In the first phase of reconstruction of the facility, in 2010, nearly a million eur has been invested in equipment that enabled a further reduction in the consumption of fresh water, as well as significantly increased level of wastewater treatment.
At this stage, the rehabilitation of the existing system for wastewater treatment has been completed, reparation of chemicals dosing system, presses for dewatering waste have been installed and the device for further purification of water inside the internal water flow, as well as additional floater, all with the purpose of maximizing the recirculation of water within the production process, and therefore more efficient operation of systems for wastewater treatment.
The next phase of the project, from which we expect to get closer to highest standards of environmental protection, is biological wastewater treatment.